Pricing schema incorrectly picked in PIR

$
0
0

Hi All,

 

I had an info record created automatically from the PO at POrg level. The gross price condition type in the PO is PBXX due manual price maintenance in the PO and the pricing schema determined is RM0000.

 

Now when I try to maintain th info record at plant level and maintain condition value for PB00 the system gives an error as

 

Condition type PB00 is not in procedure A M RM2000

Message no. VK045

 

But the problem is that the schema RM2000 (Stok transfer document) determined here is not correct. It should be RM0000 as it is in the PO.

 

I am not able to understand why the system determines RM2000 in the info record and doesn't allow me to maintain PB00.

 

Regards,

V S