Friends
It is a standard process for SAP to convert from Object Currency to CO currency using the FX rate mentioned in TCURR table.
I am loading my 2016 data in CAD which is my Object Currency and it converts to USD (CO Currency). I am loading data for each period and want SAP to use each period specific CAD to USD rate and convert it to USD, instead SAP is using rate which is effective in Period 1 for all other period as well, even though I have CAD/USD rate defined for each period separately.
Is there a way I can tweak system to use period specific exchange rate and do conversion to Co currency?
I would appreciate your help on this urgent issue.
Thanks