What is the best way to setup a conditional Tolerance Limit in Internal Order budget with the following logic:
1. Absolute Variance of $1,500 if 10% of Budget is less than $1,500
2. Otherwise, maximum variance is 10%
Thanks.
Hello,
What is the best way to setup a conditional Tolerance Limit in Internal Order budget with the following logic:
1. Absolute Variance of $1,500 if 10% of Budget is less than $1,500
2. Otherwise, maximum variance is 10%