Hi SAP User ,
We are changing SLED data of FERT material form Day 'D' to Month 'M' .
Our requirement , SLED will just before one month from the date of manufacturing date /month .
But SAP calculating :-
Total shelf life in material master = 12 month
Period indicator in material master = M (month)
Manufacturing date given during MB31 say 10.04.2016
SLED calculating through SAP = 10.04.2016 + 12 month = 04/2017
But our requirement , it should be 03/2017 instead of 04/2017 ( Just one month before from the manufacturing date )
Please guide me how to resolve the issue .
Regards,
Amit Biswas