Hi Everyone,
I am trying to convert a single source universe to multi-source universe. I have created a new multi-source DF on top of a multi-source connection. Now instead of creating a new BL on top of the multi-source DF, I want to re-map the existing single source BL to the new multi-source DF. But this way all the objects are coming blank and I have to write the SQL for each and every objects and conditions again, which is as good as creating a new BL. Can anyone suggest me a better work around other than creating a new BL or is there anything which I am missing.
Tool Summary:
SAP BI 4.1 IDT
Oracle 11g
OS: Windows 7(64-bit)
Thanks,
Mahmood