Hello All,
We have BPC NW 10.1 on BW 7.4 with non HANA DB at Location A and BW 7.4 with HANA DB at Location B.
We wanted to transport the BPC environment from Location A to Location B server and learnt that below should be the steps after going through the various discussions. Could you please confirm if below mentioned steps are appropriate or we need to add anything else for successful migration?