Dear experts,

 

we are working with aggregated planning in SNP and now the disaggregation rules provided by SAP don't fit our requirements.

the standard Disaggregation methods are:

  • Based on demand
  • Based on Quota

but we need to disaggregate and have at the end of the disaggregation the same days of coverage at the destination locations.

 

do you know if this is possible by standard to disaggregated the STR based on the days of supply?

 

Some examples are shown below

 

In case of Supply > Demand and Disaggregation based on Demand the results are:

Basic parameters: only one bucket (granularity week) and 7 days of Target days of supply

total=aggregated view

Demand surplus.JPG

If we check in detail the picture above, we see that the STR are split based on the demand (net requirements) but the days of coverage are not the same.

 

When applying the disaggregation based on days of coverage the expected results are:

Demand surplus 2.JPG

as you can see in the picture above the days of coverage are the same for both locations.