Hi Team
The access reqeust which i create in Dev system shows decision pending although requst is approved at all stages .The provisioning is not hapenning.I have attached the screen shot.
I have checked all parameter and settings and all looks fine.Tried to regenerate MSMP but no success.
Please let me know if anyone has faced this issue before and its resolution
Below is the system status
GRCFND_A V1100 7 SAPK-V1107INGRCFNDA GRC Foundation ABAP
GRCPINW V1100_731 7 SAPK-11507INGRCPINW SAP GRC NetWeaver Plug-In
Thanks
Nitesh